University of Virginia Hospital
Charlottesville, VA: This green roof includes a beautiful glass feature that simulates a river. Continue Reading University of Virginia Hospital
...With decades of experience providing turnkey SWPPP Compliance Services on thousands of projects, large and small, Greenrise has learned the most important issues Operators of Construction Projects need to be concerned with most regarding stormwater discharge regulations at the federal, state, and local level.
Stormwater Pollution Prevention Narrative Plan
The ‘SWPPP’ is a fundamental element to construction stormwater permits. This is a ‘project specific’ plan, describing how you will reduce pollutants discharged from your site during rain events.
State (fees) and local filings (no fees)
A Permit is submitted, and a fee is paid to the Texas Commission on Environmental Quality to discharge runoff from a construction site. Local filings are also required.
Inspections and updates
Regular inspections must be conducted to document compliance (or lack thereof) and The Texas Construction General Permit requires that the SWPPP be a ‘living’ document, therefore it is critical that the Plan be updated as conditions change. There are two options for these periodic inspections, but the weekly option is the most commonly used and the most advantageous option.
Postings and Best Management Practices
Permit documents must be posted prominently at the job site entrance. BMPs (i.e. Silt Fence, Inlet Protection) must be installed where needed and maintained as needed.
BMPs only
You will still need to meet the intent of the State permit by preventing silt, sediment, and other pollutants from entering a storm drain or conveyance of water by using Best Management Practices, but the SWPPP Narrative, Postings and regulatory Filings and Inspections are not required.
When a small site becomes a large site
When out-parcels are platted sharing common streets, or utilities, or a project is developed in phases, each site within the common area may be viewed as the large site and permitted as such. A good example of this would be a ‘Town Center’ with several large retailers and multiple small parcels for future sale and development.
Selecting the right BMPs can drive down total cost of compliance
Paying attention to BMP selection and installation is as important as paying attention to other aspects of the project.
Lowering the maintenance requirement is key
There are no ‘maintenance-free’ BMPs. High maintenance BMPs can cost many times the initial installation cost during the life of a project.
Question “the way we’ve always done it”
Innovative and evolved BMPs usually provide a better solution, have lower maintenance requirement, and lower costs.
The SWPPP site plan is not the SWPPP
It may be titled ‘Erosion Control Plan’ or ‘Stormwater Pollution Prevention Plan’ or something similar.
Regardless of the title on the page, the drawing is simply one component of the SWPPP narrative plan – one of many ‘exhibits’ required to be in the SWPPP Narrative.
It’s the first thing the enforcement officer sees
Highly visible, usually located near a public roadway
Most likely to generate a complaint
Crushed concrete surface is intended to dis-lodge mud and dirt by flexing tire treads. Public traffic does not appreciate navigating through muddy, hazardous streets. Citizen complaints will ALWAYS generate a regulatory Inspector’s visit.
Specifications (anything less is just not enough)
25′ wide X 50′ long
3” X 5” Crushed Concrete
8” deep over heavy underlayment fabric
First thing the enforcement officer looks for
Required to encourage the “Whistle Blower Act” Any citizen has the right to determine who the Operator is and report problems to enforcement. Signage that displays the permit and other posting documents is located at the construction entrance and must be convenient for public viewing.
Potentially The Richest Source Of Violations
The easiest thing to enforce; the Enforcement Officer can thoroughly examine the SWPPP Narrative in the construction site office. There are many required elements of a proper SWPPP including the narrative, regular updates, amendments, and weekly inspection reports.
Direct discharge of polluted water is a clean water act violation
When dewatering a jobsite, care must be taken to do so responsibly. Such discharge is taken very seriously by Enforcement Officials.
Direct discharges are typically very visible
It is very easy for Enforcement or the public to recognize and take action against the Operator.
The Options
Requirements raised
Rinsate from concrete truck washing contains contaminates harmful to living creatures – it must not be allowed to go to the ground.
Containerized solutions
Specialized containers for this purpose, or lined roll-off bins work best. Non-compliance brings immediate fine or lawsuit. These are not acceptable circumstances to the enforcement community. A water-tight container is the best solution.
BMP selection and location are up to the Operator under Texas Construction General Permit
The only requirement is to implement what’s needed to meet the regulatory obligation.
Revising the plan to fit actual site needs almost always lowers cost of compliance
Eliminate waste – in many cases, perimeter BMPs indicated on the SWPPP Site Plan may not be required if there is a sufficient vegetated buffer area between disturbed areas and any conveyance of water, or if the flow is back onto the site. Changing the plan requires documentation, but may be done by a “qualified” person.
Lower costs by protecting your excavation investment during construction
Old methods raise costs and put client relationships in jeopardy. Hydro-mulch seed on pond slopes is very likely to be washed away, before germination, during even small rain events–and you’ll have to repeat the process.
Stabilization done once is cheaper – Hydraulically applied erosion control blankets bond with the soil, securing to the slope and establishing vegetation quickly.
Stabilize ponds/slopes as soon as they’re graded. Who’s going to pay the excavation contractor to repair slopes damaged due to rainfall?
Stabilization is a critical aspect of compliance and your project will remain at risk of enforcement actions until all disturbed areas are paved, built upon or vegetated.
Inspection reports are legal documents
Inspections should not be taken lightly. Intentionally falsifying an inspection report is a violation of Federal law and can result in a fine or imprisonment
There is nothing wrong with noting problems on an Inspection Report, an inspector has no option if problems exist. Violations are inherent in any jobsite and non-compliant conditions should be written up, then corrected. Not correcting violation is what will get you in trouble.
Inspection Report should be a “snapshot “of site conditions, reflecting good and bad. Enforcement Officers know all sites have problems and expect to see them noted on reports.
The Clean Water Act is designed for citizen lawsuits
CWA was intended to spur citizen participation in oversight of environmental concerns. Think about the requirement that signage with operator permits must be posted prominently, visible by the public.
Enforcement personnel operate under mandates for rapid response to complaints
Citizen complaints generate the majority of enforcement investigations and complaints are moved to the front of the line for enforcement response.
TCEQ Compliance History database in place
Updated September 1 of each year based on operator’s compliance history for the previous 5 years. The resulting rating is, intended as, a measure of the contractor’s environmental compliance. Your rating may impact your ability to get future work or a new permit.
Charlottesville, VA: This green roof includes a beautiful glass feature that simulates a river. Continue Reading University of Virginia Hospital
...The Sazerac House, a new interactive cocktail museum, just opened in October of 2019. The 48,000 square-foot, historic building stands on the corner of Canal…
...Slope Stabilization and Turf Establishment Success Using Profile Products Continue Reading Tenaris
...Springwoods Village is the nation’s largest Low Impact Development, nestled on approximately 2,000 acres on the southern bank of Spring Creek at the confluence of…
...Low Impact Development Methods Save the Day Continue Reading Queenston Manor Apartments
...Nashville, TN: An intensive as well as extensive Greenroof, featuring common areas for people to enjoy. Continue Reading Pinnacle Financial Partners
...Slowing Down Runoff + Improving Water Quality = Success Continue Reading Panther Island Riverwalk
...Thirteen15 is a historic renovation project located in the New Orleans Central Business District directly across from Duncan Plaza and City Hall. Due to the…
...Three new pumps, a “smart” controller and SCADA monitoring makes this detention pond a fully monitored system that is easy-to-operate and provides operational savings and…
...Green Stormwater Infrastructure (GSI) such as permeable pavers and bioretention / biofiltration are the favored solutions since they are the most visible to the community.…
...Nashville, TN: A 191,000-square-foot greenroof designed for stormwater retention and urban heat island reduction. Continue Reading Music City Center
...The primary function of the swale was to convey water from the roadway into the biofiltration system. Continue Reading Merritt Road
...Martinez Professional Building II is a .95 acre commercial site for professional offices. The engineers were able to take advantage of using Harris County’s Low…
...Healing gardens have repeatedly been found to evoke pleasurable memories, promote good health, and act as a place of social connectivity for patients. Continue Reading…
...Numerous forms of green infrastructure, including bioretention, native plants, permeable pavers, underground detention and soil cells. Continue Reading Gretna City Hall
...While material quality, engineering and product life expectancy have changed over the past 6,000 years the way stormwater is conveyed and managed has not evolved…
...A key aspect of the recommended solution was the resulting cost savings involved with the topsoil layer. The soil test indicated that the existing soil…
...Greenrise Technologies, selected a High Performance Modular Biofiltration System (FocalPoint) to manage stormwater runoff within the swales. Continue Reading Doubletree Ranch Park
...Canopy and Root Management on Dallas Street in Ennis, TX Continue Reading Dallas Street
...Designed using the GROWVista™ modular green roof system from Green Roof Outfitters, the green roof covers a majority of the building’s roof surface and features…
...Located outside of the City of Houston in Fort Bend County, the single-family residential project known as Camellia is a great example of how Stormwater…
...Slope Stabilization and Turf Establishment Success Using Profile Products Continue Reading Buffalo Place
...This project is the first roadway project in the Houston area to implement Low Impact Development (LID) / Green Stormwater Infrastructure (GSI) techniques and is…
...Not only is Bagby aesthetically appealing, it is also environmentally friendly and is one of Texas’ first certified Greenroads. Continue Reading Bagby Street
...For worry-free compliance assurance, we combine our SWPPP Implementation and Documentation services into a Compliance Assurance Program (CAP) for your site. By doing so, you’re able to effectively transfer the entire SWPPP compliance logistics burden from your shoulders to ours.
Your project’s Compliance Assurance Plan is provided from start-up and filing of the Notice of Intent (NOI) through final stabilization of the site and filing of the Notice of Termination (NOT). Your CAP consists of a comprehensive suite of services that assures compliance on your site.
1500 Medical Center Pkwy
Murfreesboro, TN 37129
629.230.2150
info@greenrisetech.com
Tennessee: 629.230.2150
Texas: 832.456.1000
South Carolina: 629.230.2150
North Carolina: 803.328.0088